Fertilizer
Removal of existing RG boiler, Piping, Accessories and erection, testing, chemical cleaning and commissioning of Retrofit RG boiler till normal production on LSTK basis KSFL, Shahjahanpur 18 Days 2011
De-erection and re-erection of S-50 Synthesis Ammonia Converter IFFCO, Aonla - 2011
Maintenance of 234 nos of Primary reformer top fired burners in the convection zone Kribhco, Hazira - 2010
Mech.erection of equip. and piping for NH3 loop revamp in Ammonia Plant GNFC, Bharuch 5 Months 2009/2010
Dismantling & removal of old rotary type APH & old ducts, erection of new SS plate type combustion APH in Ammonia plants Kribhco, Hazira 28 Days 2009
Dismantling, removal and positioning for relining & re-erection of Reactor- XUR-102 GSFC, Baroda - 2009
Mech,Piping & Ducting of Methonal II Reformer Revamp GNFC, Bharuch 4 Months 2008
Mechanical works for De-Bottlenecking Project Tata Chemicals Ltd, Babrala 3.5 Months 2008
Revamp of Radiant Tube Top (336 Nos) of Primary Reformer in Ammonia Plant IFFCO, Phulpur 15 Days 2008
Dismantling & Installation of Catalyst Tube Harps & Transition Assemblies of Primary Reformer in Ammonia Unit - I at KRIBCHO
KRIBHCO, Hazira
60 Days  /15 Days
Nov'02
Dismantling & Installation of Catalyst Tube Harps & Transition Assemblies of Primary Reformer in Ammonia Unit - II at KRIBCHO
KRIBHCO, Hazira
75 Days
Dec'99-Feb'00
Reversal of Urea Strippers at Indogulf Fertilizers & Chemicals Corp Ltd.,Jagdishpur,
IGFCC, Jagdishpur
30 Days
Apl'99
Revamp of Radiant Tube top (336 nos.) of primary reformer in Ammonia Plant at IFFCO, Phulpur
IFFCO, Phulpur
28 Days
Dec'99
Fabrication of H.P Urea Grade Piping and Replacement of Urea Strippers, Erection of 102C, 122F Vessels and Liner Welding of Urea Reactor at KRIBCHCO, Hazira
KRIBHCO, Hazira
45 Days
Dec'98 -Jan'99
Replacement of LT Superheat coil at IFFCO, Kalol.
IFFCO, Kalol.
20 Days
Oct'98
Revex Replacement for Revamping of ASU of Ammonia Unit at GNFC, Bharuch involving welding 2000"" dia of Aluminum Piping
GNFC, Bharuch
15 Days
Apr'98
Revamp of Primary Reformer-III of Ammonia Plant at IFFCO-Kalol
IFFCO, Kalol.
16 Days
Mar'98
Removal & replacement of Tube bundle of 101 CA/CB at Kribhco, Surat
Kribhco, Surat
26 Days
Apr'96
Methanol-II Reformer Revamp Shutdown
GNFC, Bharuch
24 Days
Feb'95
De-bottle Necking Project/ATR shut down at TATA Chemicals, Babrala
TCL, Babrala
30 Days
Dec'94-Jan'95
 
Oil & Gas
Replacement of Flanges & Pipe Fittings at Lakshmi Onshore Terminal, Hazira of Cairn Energy
Clough, Australia
30 Days
Sep'02
 
Petrochemical
Complete Revamp of 5 Heaters of Naphta Unit at IPCL, Baroda including 3 Stacks and associated Refractory Works
IPCL, Vadodara
14 Days
2006
Several routine Plant Shut-down jobs and Annual Turn Around jobs at Reliance Industries, Hazira
Reliance, Hazira
-
-
Cryogenic
PP vessel modification,fabrication,erection,painting & mech comp.of Plant 1&2 & Trim heater in Plant2
JPOCL, Bellary
12 Months
2009/2010
Refinery
FCCU Regenerator Turnaround jobs Reliance Industries Ltd, Jamnagar 90 Days 2011
Reactor-Regenerator Modification Works including Cyclone replacement at HPCL, Vizag
HPCL, Vizag
-
2010
FRE Revamp job at HPCL, Mumbai HPCL, Mumbai
HPCL, Mumbai
-
2009
FCCU Shut Down/Revamp including Cyclone Replacement at BPCL, Kochi
BPCL, Kochi
-
2008
Revamp of CRU Heater Package at BPCL Mumbai Refinery
BPCL, Mumbai
-
2005

Replacement/ Rectification of 44 Cyclones in FCCU Regenerator & multiple Nozzles in various vessels of FCCU and 200MT Clad Dome Replacement for Crude Column  at Reliance, Jamnagar

RPL, Jamnagar.
30 Days
Oct'05
"Piping of 57000"" dia in FCCU, FR-APS, OFFSITE, Crack LPG at HPCL, Mahul Refinery."
HPCL, Mumbai
45 Days
Jan- Mar'05

Revamp of Crude Column Top, CDU/VDU Heaters, Nozzle Modification in Crude/ Amine Unit, Replacement of Monel Clad Strip in Coker Column, Replacement of Super Heater Coils at Reliance, Jamnagar

RPL, Jamnagar.
30 Days
Nov -Dec'03
Replacement of Regenerator Dome & Cyclones involving refractory removal & reapplication, Fab & Erection of Temp Structures in FCCU at KRL, Kochi.
Technip KTI, New Delhi
90 Days  /20 Days
Oct-Dec’02
Revamp of Air PreHeater, CDU/VDU Heaters, Reformer Flange Replacement for Reliance Refinery Shutdown at Jamnagar 
RPL, Jamnagar.
60 Days  /15 Days
Nov'02
Structural Steel Replacement, NPCB Project, Piping and Structural for DHDS Jobs, MS Maximisation and OM&S Project at HPCL, Mahul.
HPCL, Mumbai.
45 Days
Dec'98 -Jan'99
Piping and Mechanical Erection Jobs for Heat Optimisation Project at HPCL Mahul Refinery.
HPCL, Mumbai.
25 Days/
Dec'94-Jan'95
Petrochemical
Repl. Of heater tubes & convection zone tube support Reliance Industries Ltd, Patalganga 12 Days 2011
Steel & Metalurgical
Module V Capital Shutdown Essar Projects India Ltd. 35 Days 2011
Upper Burden Feeder Shaft replacement Ispat Industries Ltd, Pen 15 Days 2009
Recuperator Bundle modification of Mod V-Shutdown Essar Projects India Ltd 30 Days 2008
Replacement of 3 Nos. of UBF SHT along with 3 nos. of UBF nozzles at ISPAT Steel Plant, Pen
Ispat Industries Ltd.
7 Days & 14 Days
2007
Revamp of Mod-1 & 2 Refomers & Furnace of HBI Plant at Essar Steel, Hazira
Essar Construction, Hazira
20 Days each
Sep'05
FTB Chamber Replacement of EAF-1 & 2 Plants at Essar Steel, Hazira
Essar Construction, Hazira
20 Days
Apl'05 & Sep'05
Revamp of Mod-III Reformer & Furnace of HBI Plant  & FTB Chamber Replacement of EAF-3 Plant at Essar Steel, Hazira.
Essar Steel, Hazira
30 Days
Nov- Dec'04

Revamping of Reformer Tubes, Replacement of Shafts and Refractory Works in Furnace of Module - I in Essar Steel Ltd., Hazira

Essar Steel, Hazira
30Days /     5½ Days
May'03
Replacement of Charge Hopper & Proportionating Hopper Assembly, Feed Gas, Bellows & Tubes, Hot Air Pre Heater at Ispat Industries, Pen
Ispat Industries Ltd., Raigad,
75 Days
Dec'02

Extention of Reformer, Refractory Lining of Furnace & other Mechanical Jobs at Mod. I & II at Essar Steel Ltd., Hazira.

Essar Steel, Hazira
20 Days
Dec'99-Feb'00
Revamping of Reformer Tubes and Refractory works at Module - II in Essar Steel Ltd, Hazira.
Essar Steel, Hazira
90 Days  /20 Days
Oct'98
Replacement of Shafts & Refractory Work in Furnace & other asscoiated works of Mod-III at Essar Steel,Hazira.
Essar Steel, Hazira
15 Days
Apr'98
Revamping of Reformer Tubes, Replacement of Shafts and Refractory Works in Furnace of Module - I in Essar Steel Ltd.
Essar Steel, Hazira
28 Days
Dec'99