| Removal of existing RG boiler, Piping, Accessories and erection, testing, chemical cleaning and commissioning of Retrofit RG boiler till normal production on LSTK basis | KSFL, Shahjahanpur | 18 Days | 2011 |
| De-erection and re-erection of S-50 Synthesis Ammonia Converter | IFFCO, Aonla | - | 2011 |
| Maintenance of 234 nos of Primary reformer top fired burners in the convection zone | Kribhco, Hazira | - | 2010 |
| Mech.erection of equip. and piping for NH3 loop revamp in Ammonia Plant | GNFC, Bharuch | 5 Months | 2009/2010 |
| Dismantling & removal of old rotary type APH & old ducts, erection of new SS plate type combustion APH in Ammonia plants | Kribhco, Hazira | 28 Days | 2009 |
| Dismantling, removal and positioning for relining & re-erection of Reactor- XUR-102 | GSFC, Baroda | - | 2009 |
| Mech,Piping & Ducting of Methonal II Reformer Revamp | GNFC, Bharuch | 4 Months | 2008 |
| Mechanical works for De-Bottlenecking Project | Tata Chemicals Ltd, Babrala | 3.5 Months | 2008 |
| Revamp of Radiant Tube Top (336 Nos) of Primary Reformer in Ammonia Plant | IFFCO, Phulpur | 15 Days | 2008 |
| Dismantling & Installation of Catalyst Tube Harps & Transition Assemblies of Primary Reformer in Ammonia Unit - I at KRIBCHO | KRIBHCO, Hazira |
60 Days /15 Days |
Nov'02 |
Dismantling & Installation of Catalyst Tube Harps & Transition Assemblies of Primary Reformer in Ammonia Unit - II at KRIBCHO |
KRIBHCO, Hazira |
75 Days |
Dec'99-Feb'00 |
Reversal of Urea Strippers at Indogulf Fertilizers & Chemicals Corp Ltd.,Jagdishpur, |
IGFCC, Jagdishpur |
30 Days |
Apl'99 |
Revamp of Radiant Tube top (336 nos.) of primary reformer in Ammonia Plant at IFFCO, Phulpur |
IFFCO, Phulpur |
28 Days |
Dec'99 |
Fabrication of H.P Urea Grade Piping and Replacement of Urea Strippers, Erection of 102C, 122F Vessels and Liner Welding of Urea Reactor at KRIBCHCO, Hazira |
KRIBHCO, Hazira |
45 Days |
Dec'98 -Jan'99 |
Replacement of LT Superheat coil at IFFCO, Kalol. |
IFFCO, Kalol. |
20 Days |
Oct'98 |
Revex Replacement for Revamping of ASU of Ammonia Unit at GNFC, Bharuch involving welding 2000"" dia of Aluminum Piping |
GNFC, Bharuch |
15 Days |
Apr'98 |
Revamp of Primary Reformer-III of Ammonia Plant at IFFCO-Kalol |
IFFCO, Kalol. |
16 Days |
Mar'98 |
Removal & replacement of Tube bundle of 101 CA/CB at Kribhco, Surat |
Kribhco, Surat |
26 Days |
Apr'96 |
Methanol-II Reformer Revamp Shutdown |
GNFC, Bharuch |
24 Days |
Feb'95 |
De-bottle Necking Project/ATR shut down at TATA Chemicals, Babrala |
TCL, Babrala |
30 Days |
Dec'94-Jan'95 |
| Oil & Gas | |||
Replacement of Flanges & Pipe Fittings at Lakshmi Onshore Terminal, Hazira of Cairn Energy |
Clough, Australia | 30 Days |
Sep'02 |
| Petrochemical | |||
Complete Revamp of 5 Heaters of Naphta Unit at IPCL, Baroda including 3 Stacks and associated Refractory Works |
IPCL, Vadodara |
14 Days | 2006 |
Several routine Plant Shut-down jobs and Annual Turn Around jobs at Reliance Industries, Hazira |
Reliance, Hazira |
- |
- |
| Cryogenic | |||
PP vessel modification,fabrication,erection,painting & mech
comp.of Plant 1&2 & Trim heater in Plant2 |
JPOCL, Bellary |
12 Months |
2009/2010 |
| Refinery | |||
| FCCU Regenerator Turnaround jobs | Reliance Industries Ltd, Jamnagar | 90 Days | 2011 |
Reactor-Regenerator Modification Works including Cyclone replacement at HPCL, Vizag |
HPCL, Vizag |
- |
2010 |
FRE Revamp job at HPCL, Mumbai HPCL, Mumbai |
HPCL, Mumbai |
- |
2009 |
FCCU Shut Down/Revamp including Cyclone Replacement at BPCL, Kochi |
BPCL, Kochi |
- |
2008 |
Revamp of CRU Heater Package at BPCL Mumbai Refinery |
BPCL, Mumbai | - |
2005 |
Replacement/ Rectification of 44 Cyclones in FCCU Regenerator & multiple Nozzles in various vessels of FCCU and 200MT Clad Dome Replacement for Crude Column at Reliance, Jamnagar |
RPL, Jamnagar. |
30 Days |
Oct'05 |
"Piping of 57000"" dia in FCCU, FR-APS, OFFSITE, Crack LPG at HPCL, Mahul Refinery." |
HPCL, Mumbai |
45 Days |
Jan- Mar'05 |
Revamp of Crude Column Top, CDU/VDU Heaters, Nozzle Modification in Crude/ Amine Unit, Replacement of Monel Clad Strip in Coker Column, Replacement of Super Heater Coils at Reliance, Jamnagar |
RPL, Jamnagar. |
30 Days |
Nov -Dec'03 |
Replacement of Regenerator Dome & Cyclones involving refractory removal & reapplication, Fab & Erection of Temp Structures in FCCU at KRL, Kochi. |
Technip KTI, New Delhi |
90 Days /20 Days |
Oct-Dec’02 |
Revamp of Air PreHeater, CDU/VDU Heaters, Reformer Flange Replacement for Reliance Refinery Shutdown at Jamnagar |
RPL, Jamnagar. |
60 Days /15 Days |
Nov'02 |
Structural Steel Replacement, NPCB Project, Piping and Structural for DHDS Jobs, MS Maximisation and OM&S Project at HPCL, Mahul. |
HPCL, Mumbai. |
45 Days |
Dec'98 -Jan'99 |
Piping and Mechanical Erection Jobs for Heat Optimisation Project at HPCL Mahul Refinery. |
HPCL, Mumbai. |
25 Days/ |
Dec'94-Jan'95 |
| Petrochemical | |||
| Repl. Of heater tubes & convection zone tube support | Reliance Industries Ltd, Patalganga | 12 Days | 2011 |
| Steel & Metalurgical | |||
| Module V Capital Shutdown | Essar Projects India Ltd. | 35 Days | 2011 |
| Upper Burden Feeder Shaft replacement | Ispat Industries Ltd, Pen | 15 Days | 2009 |
| Recuperator Bundle modification of Mod V-Shutdown | Essar Projects India Ltd | 30 Days | 2008 |
Replacement of 3 Nos. of UBF SHT along with 3 nos. of UBF nozzles at ISPAT Steel Plant, Pen |
Ispat Industries Ltd. |
7 Days & 14 Days |
2007 |
Revamp of Mod-1 & 2 Refomers & Furnace of HBI Plant at Essar Steel, Hazira |
Essar Construction, Hazira |
20 Days each |
Sep'05 |
FTB Chamber Replacement of EAF-1 & 2 Plants at Essar Steel, Hazira |
Essar Construction, Hazira |
20 Days |
Apl'05 & Sep'05 |
Revamp of Mod-III Reformer & Furnace of HBI Plant & FTB Chamber Replacement of EAF-3 Plant at Essar Steel, Hazira. |
Essar Steel, Hazira | 30 Days |
Nov- Dec'04 |
Revamping of Reformer Tubes, Replacement of Shafts and Refractory Works in Furnace of Module - I in Essar Steel Ltd., Hazira |
Essar Steel, Hazira |
30Days / 5½ Days |
May'03 |
Replacement of Charge Hopper & Proportionating Hopper Assembly, Feed Gas, Bellows & Tubes, Hot Air Pre Heater at Ispat Industries, Pen |
Ispat Industries Ltd., Raigad, |
75 Days |
Dec'02 |
Extention of Reformer, Refractory Lining of Furnace & other Mechanical Jobs at Mod. I & II at Essar Steel Ltd., Hazira. |
Essar Steel, Hazira |
20 Days |
Dec'99-Feb'00 |
Revamping of Reformer Tubes and Refractory works at Module - II in Essar Steel Ltd, Hazira. |
Essar Steel, Hazira |
90 Days /20 Days |
Oct'98 |
Replacement of Shafts & Refractory Work in Furnace & other asscoiated works of Mod-III at Essar Steel,Hazira. |
Essar Steel, Hazira |
15 Days |
Apr'98 |
Revamping of Reformer Tubes, Replacement of Shafts and Refractory Works in Furnace of Module - I in Essar Steel Ltd. |
Essar Steel, Hazira |
28 Days |
Dec'99 |